8-18-2011: The cowl is essentially finished except for a few little items that Dan has spotted since he set it aside. Now it's time to get to work on the lower rear section of the body. Drainage must have been an issue and perhaps salt was used on the roads since there's some corrosion all along the lower rear and sides of the body sheet metal. This is in the area where the metal "turns under" and is attached to the underside of the wooden substructure. In a few areas, the metal is gone. There are pinholes rusted through along much of the edge.
Dan is fabricating patch panels to match the existing contours of the body and tack welding them in place. This is a slow, tedious, demanding process.

No comments:
Post a Comment